احتاج حل لواجب ادارة مشاريع Question: a) Perform resource allocation for the project shown in the following table using the series method. Assume that all activities are performed by the main contractor and the maximum resource availability is 5 Laborers. b) What is the minimum project duration for part (a) if you know that In addition to the labors, activities (G) and (I) require continues use of a same equipment throughout their durations. No more than one equipment can be made available during project duration. (Use the below table when needed only and show your work)